After two weeks, The flooring are complete!!
The flooring are complete after two week of renovation (28 Oct - 14 Nov) . Its all cover up with cupboard so that they can start their plastering and painting for this week 3.
Master bedroom toilet - small and miserable.
A close-up look of the tiles in all the toilet. Very spa like, I love it.
The view from the masterbed room door
The view from the door of spare room, future children room
View from the door of the store room.
View from the door of the study room.
View from the window area in the spare room.
View from the door of masterbed room to the living room
View from the kitchen to the living room.
Common toilet. Another small toilet.
The kitchen & dinning area. The dinning area is level to the living room and the drop is the kitchen area.
The kitchen area.
Master bedroom toilet - small and miserable.

0 Comments:
Post a Comment
<< Home